-Construction of 9.45km pipeline
-Materials for pipeline
-Concrete and masonry works
-Project administrative cost
-Construction and fabrication of 1 elevated steel water tank 50m3 capacity on 24m high tower
-Construction of 50m3 sump tank, Installation of solar pumping system
-Construction of chain-link fence 0.22km
-Construction of security house