-Construction of 4 No. span of 70m each 33KV high voltage transmission line
-Construction of transformer structure
-Installation of tapping link expansion fuses and distributing transformer
-Construction of 2 No. span of 50m each low voltage distribution lines
-Installation of 25sq mm 4 core copper drop cable and sundries
-Installation of meter box, isolator switch gear, 125 Amps MCCB
-Provision for administration- 1% of the total costs incurred.